logo
منزل مدونة

Golf Course Pond Waterproofing Saves Water in Arizona

شهادة
الصين Hebei Boda Plastic Technology Co., Ltd. الشهادات
الصين Hebei Boda Plastic Technology Co., Ltd. الشهادات
زبون مراجعة
شكرا جزيلا.

—— السيد روسي

شكرا يا صديقي.

—— السيد والتر

شكرا على المراجع ، أرى أنك شركة جادة وذات سمعة طيبة.

—— السيد دانتاس

ابن دردش الآن
الشركة مدونة
Golf Course Pond Waterproofing Saves Water in Arizona
آخر أخبار الشركة Golf Course Pond Waterproofing Saves Water in Arizona

A waterproofing contractor working in Arizona lined a golf course irrigation pond with reinforced PVC membrane, removed seepage across 73,459.55 square feet (6,824.62 m²), and cut on-site labour hours by more than 40 per cent. The work used MM-Tech pond liner welding machine technology, with most of the welding moved into a workshop and only the field joins done at the pond.

Every Drop Counts in the Arizona Desert

Keeping a golf course green in the Arizona desert is a water-management problem before it is an agronomy problem. Golf Course Pond #5 in Litchfield stores irrigation water for the surrounding course, and seepage through highly permeable soil was draining the pond and driving up pumping cost every week of the season.

The contractor was asked to rehabilitate the pond and put a reliable waterproof barrier under it. The treated area is 73,459.55 square feet, or 6,824.62 m². The real constraint was geometry: the pond is irregular, and rolls laid straight on site mean cuts, overlaps and patches on every bay, which raises material waste and puts more weak seams in the ground. The course also could not afford to lose its irrigation supply while the work ran.

Eight Custom Panels, One Reliable Solution

The membrane is 30 mil reinforced PVC, which is 0.76 mm. PVC is welded at a lower temperature than HDPE, and the machine is therefore specified on thickness before anything else: a hot wedge welder in the CX300 class covers 0.5 to 1.5 mm at 1400 W, runs 0 to 9 m/min, weighs 7 kg, and carries a 15 mm by 2 plus 12 mm air channel with a 100 mm overlap and single or double side feed.

Instead of welding everything outdoors, the contractor moved most of the work into a controlled workshop. On an automatic CX300, PVC sheets are joined at constant temperature, speed and pressure, and the output was eight custom panels cut to follow the pond contours. Prefabrication also cut exposure to wind and dust, which is what held seam quality steady while the panels were staged for installation.

The wedge welder takes the long straight runs; the details stay with a hand unit. A hot air welder in the CX1600S class at 1600 W, 20 to 620 °C and 160 L/min works the corners, the pipe penetrations and the patches a wedge cannot reach, and it is the hot air plastic welder to reach for on PVC detail work where a wedge has no access.

Tested for Strength, Welded for Reliability

Before installation, sample welds were cut and pulled. Peel and tensile tests verify the mechanical strength of the seam: the CX-001 coupon cutter takes the specimen, the CX-TEN tension gauge records the pull, and the acceptance line is 85 per cent of base material or better.

The wedge seam carries a second check that a hot air bead cannot. Two parallel tracks with an enclosed air channel between them make the joint a testable object: with the CX-002 air-pressure tester the channel is pressured and the gauge read over the holding period, which proves the seam along its full length instead of at the one point a coupon came from.

Once weld quality was confirmed, the eight panels went to site, were positioned inside the pond and joined with the same CX300. Controlled prefabrication, systematic testing and precise field welding produced one continuous barrier over the whole treated area.

Less Water Loss, More Efficient Installation

The completed system eliminated seepage across the entire 73,459.55 square feet (6,824.62 m²). The gains went beyond water conservation: prefabricating eight panels cut direct on-site labour hours by more than 40 per cent, lowered supervision load, and took the crew out of the worst of the desert heat.

For the course, the pond is now a reliable irrigation reservoir. For the contractor, the project shows what happens when a dam liner welding machine is used as a prefabrication tool and not only as a field tool: the geomembrane welder sets the pace in the workshop, and the field work shrinks to joins, tests and repairs.

Chinese Engineering, Local Crews

From workshop prefabrication on the CX300 through coupon testing to the final field joins, each machine in the sequence does one job and holds its set point, which is what makes a controlled process possible on a site where wind, dust and heat all work against the seam.

MM-Tech builds the geomembrane welding machine range in Shijiazhuang, Hebei, supplies matched nozzles, rollers and spare sets, and trains crews on installation, testing and repair. The installation expertise stays local; the welding technology is specified, tested and repeatable.

Solutions for Pond Waterproofing

Planning a pond, reservoir or water containment project? A hot wedge welder between the CX300 and CX700 covers 0.5 to 4.0 mm geomembrane, thin PVC film included at the low end; the CX1600S handles PVC detail work, penetrations and repairs. Specify the machine against the membrane, and test the seam before the water goes in.

حانة وقت : 2026-11-27 17:45:28 >> قائمة المدونات
تفاصيل الاتصال
Hebei Boda Plastic Technology Co., Ltd.

اتصل شخص: Mr. David Xue

الهاتف :: +8613739745191

الفاكس: 86-311-68009658

إرسال استفسارك مباشرة لنا (0 / 3000)